Veloway 1 Stage E
Stage E of the Veloway 1 (V1) upgrade delivered 1.6 km of dedicated cycleway between Birdwood Road and Gaza Road, including three bridge crossings and new local road connections, improving safety and connectivity for cyclists.
The V1 is a critical active transport corridor connecting residential, employment and commercial precincts across Brisbane’s southern suburbs alongside the Pacific Motorway. As the largest package within the overall upgrade, Stage E involved complex bridge construction, utility relocations, and works adjacent to and over live traffic environments. Environmental management, including the protection of waterways and delivery of extensive landscaping, was a key project priority, as well as proactive community engagement and maintaining network performance. Innovative engineering solutions, including balanced cantilever bridge construction, Super-T girders and elastomeric bearings, enabled the safe and efficient delivery of the works while minimising disruption. The completed infrastructure provides a continuous, safe and resilient cycleway, for one of the State’s fastest growing regions.
-
Sector
Sport and recreation, Transport, Utilities
-
Client
Department of Transport and Main Roads
-
Location
Holland Park West / Tarragindi, QLD
-
Duration
July 2018 – May 2020
-
Value
$30M
Project Scope
- 1.6 km dedicated cycleway constructed to BCC / TMR standards
- Construction of three bridge crossings (32 pier, column, headstock configuration, bored piles)
- Installation of 68 Super-T bridge girders up to 100 t each
- Installation of 7,000 m³ concrete
- Four new local road connections at Bapaume Road, Peronne Road, Gaza Road, Birdwood Road
- Pavement construction using marginal materials and deep lift asphalt
- Service relocations, including conduits and utilities
- Landscaping and finishing works