The Deodar Drive Stormwater Upgrade delivered critical flood mitigation and infrastructure improvements in Burleigh Waters, increasing stormwater capacity, supporting future growth, and preparing the corridor for the Gold Coast Light Rail.
Awarded by the City of Gold Coast in May 2022, this $22.7 million design-and-construct project was delivered in two stages. Stage 1 involved upgrading the primary drainage chamber beneath the Lower Gold Coast Highway to facilitate future Gold Coast Light Rail integration, while Stage 2 delivered major drainage infrastructure improvements and pavement reconstruction along Deodar Drive. Undertaken within a constrained residential and commercial environment, the works required deep excavations of up to five metres, extensive stakeholder coordination and carefully staged construction to maintain traffic flow, pedestrian access and access to surrounding properties. The project involved close interface management with the Gold Coast Light Rail team, local residents and businesses, as well as works adjacent to live Telstra services, requiring meticulous planning and service protection measures. The completed project enhanced network resilience through increased drainage capacity while also delivering upgraded road infrastructure, kerb and channel, and improved amenity for residents, businesses and road users.
-
Sector
Transport, Utilities
-
Client
City of Gold Coast
-
Location
Burleigh Waters, QLD
-
Duration
May 2022 - January 2025
-
Value
$22.7M
Project Scope
- Design and construct drainage upgrades to relevant standards
- Excavations within the water table, up to 5 m deep
- Construction of major drainage structures
- Procured and installed 1,070 m of RCP pipes ranging from 450 mm to 1,650 mm diameter
- Reconstructed 6,000 m² of pavement along Deodar Drive, kerb to kerb, and on subsidiary streets