D’Aguilar Highway Wide Centreline Treatment

Upgrades along the D’Aguilar Highway west of Kilcoy improved safety and network performance through targeted road widening, intersection improvements and drainage enhancements.

Delivered for the Department of Transport and Main Roads, the project targeted a high-risk section of the highway to reduce the likelihood of head-on collisions and improve traffic flow. Works included widening a four-kilometre section of roadway, upgrading drainage and culverts, and extending road shoulders to enhance long-term resilience. Dedicated right-turn lanes were constructed at the Franks Lane and Bye Road intersections to improve access and reduce delays, while vegetation clearing, new signage, safety barriers and linemarking improved visibility and driver awareness. Together, these upgrades have enhanced safety and reliability for motorists travelling through the region.

  • Sector

    Transport

  • Client

    Department of Transport and Main Roads

  • Location

    Kilcoy, QLD

  • Duration

    January 2022 - July 2023

  • Value

    $8.2M

Project Scope

  • Widened a 4km section of the D’Aguilar Highway between Moodlu and Wamuran
  • Installation of a 1m wide centreline to reduce the risk of head-on crashes
  • Upgrades to the Franks Lane and Bye Road intersections with right-turn lanes
  • Clearing roadside vegetation to improve visibility
  • Installing new signage to reinforce overtaking rules
  • Upgrading existing drainage, widening shoulders, and extending/replacing culverts
  • Installation of safety barriers at key locations
  • Completion works including bitumen spray seal, asphalt intersections, line marking, and restoration of property entrances