Lake Macdonald Bridge Upgrade

McIlwain was engaged by Seqwater to design and construct a new bridge and improve road access at Lake Macdonald, Noosa, ahead of the main dam upgrade works, aiming to provide safe access for construction traffic and ongoing Water Treatment Plant operations.

The project was delivered as part of Seqwater’s Dam Improvement Program to ensure dams across South East Queensland meet national and state safety standards. The existing bridge was a single-lane timber structure with limited flood immunity, restricting access during high rainfall events. McIlwain replaced it with a two-lane, single-span concrete bridge, constructed downstream of the existing structure to allow continuous access, accommodate heavy vehicles, and meet future operational requirements. The works included service relocations, approach road upgrades, erosion and service protection, and environmental management including aquatic fauna relocation.

  • Sector

    Marine, Transport

  • Client

    Seqwater

  • Location

    Lake Macdonald, Noosa, QLD

  • Duration

    September 2020 – October 2021

  • Value

    $3.9M

Project Scope

  • Detailed design and construction
  • Removal of existing timber bridge
  • Single 25 m span bridge with abutments
  • Abutment and embankment protection (grouted rock)
  • Approach road pavements (east and west)
  • Asphalt tie-ins to existing roads
  • Construction of driveway entry crossover
  • Multiple service relocations
  • Watermain diversions including across bridge
  • Temporarily lowered water levels and aquatic fauna relocation
  • Compliance with environmental approvals