Hampton Downslope Remediation
SectorTransport
ClientTransport for NSW
LocationJenolan NSW
DurationJanuary 2024 to September
Contract Value$13M

Following several major rainfall events, Jenolan Caves Road was impacted by major erosion, significant slope failures, and landslides. Remediation work is required at several sections along the slope.

The site is located along Jenolan Caves Road, approximately 1.6 km south of Hampton. With significant slope failure and major erosion, preliminary repairs were required. The repair work to the upslope has included rock bolting, hydro mulching and rock fall mesh. Ongoing rehabilitation required to further secure the slope is currently underway.

The scope of works includes:
Replacement of seven culverts including scour protection
Replacement of traffic barrier
Shoulder reinstatement
Installation of 200 soil nails
Shotcreting over two locations along the slope

Transport

We pride ourselves on delivering optimal transport infrastructure throughout Queensland and NSW.

READ MORE

Building

McIlwain provide high-quality solutions that are designed to be both cost-effective and fit for purpose.

READ MORE

Urban

Working collaboratively with consultants, developers and councils to deliver urban infrastructure.

READ MORE

FEATURE PROJECT

Coomera Connector Stage 1 Central

Sector
Transport, Urban

Client
Department of Transport and Main Roads

Location
Helensvale to Molendinar

READ MORE

Search Projects

Region

Project Status


Sector/s

Oakey Roads and Carpark Resurfacing

Hampton Downslope Remediation

Coomera Connector Stage 1 Central

Rockhampton Bruce Highway Intersection Upgrade

Cunninghams Gap Reconstruction Project

Burleigh to Palm Beach Motorway Upgrade

Deodar Drive Stormwater Upgrades

South Coast Region Natural Disaster Program

Beechmont Road (South Coast Natural Disaster Program)

Tully Timber Bridge Replacement

D’Aguilar Highway Wide Centreline Treatment

Binna Burra Bushfire Recovery Works

LOAD MORE